Electric work of industrial facilities and environmental facilities(beside dust collector, combined heat power plant, district heating corporation, waster disposal facility),
2.
Automatic control facility construction of electric facilities for operation, monitoring and signalization of factory automation
3.
Facility construction of switchboard, panel board, power trunk line, branch and piping (including duct and cable tray)
1.
Installation of electric machines/equipments (generator, transformer, cubicle)
2.
Electric cable installation work((including wiring disaster preventing facility installation work)
3.
Electric work of lighting tower installation and lighthouse
4.
ther electric facility installation work necessary for port
ELECTRIC DISTRIBUTION WORK
1.
Support structure work such as telephone pole
2.
Electric equipment installation work such as transformer
3.
Wiring work(including wood cutting work)
1.
Electric underground wiring pipe facility work
2.
Electric cable facility work (including wiring disaster preventing work)
3.
Electric tunnel facility work
4.
Electrical installation work in shared premises
MARINE PLANT ELECTRIC WORK
1.
Raw material unloading equipment CSU, SNNC electric work
2.
Port unloading crane RMGC, LLC, BTC electric work
3.
Electric work of marine structure, prospecting ship
1.
Ship electric work
2.
Electricity installation work of port crane O.P Room
3.
Manufacture and installation work of marine facility Panel
GENERAL BUILDING CONSTRUCTION AND COMPLETE INSPECTION
1.
Power supply facility construction
2.
Panel board and power load equipment installation work
3.
Construction of lightening protection system and grounding
1.
Thermography measuring
2.
Diagnosis of electricity cable and emergency recovery work of breakdown points
3.
Complete inspection of electric equipments
This window will automatically close when payment is processed.
Do not close this window until processing completes.
WORLD SHIPPING
PLEASE SELECT THE DESTINATION COUNTRY AND LANGUAGE :